BrightNight Energy Storage – Nottingham Bess
BrightNight Energy Storage – Nottingham Bess
Project ID: BrightNight Energy Storage - Nottingham Bess LU - 2026-010 SP, CUP (785-26-000087-PLNG)
Project Type: Land Use
Project Status: In Design or Study
Date Received: Thursday, September 03, 2026
BrightNight Energy Storage – Nottingham Bess
Proposal: This is a Type III - Conditional Use permit and a Type II Site Plan Review for replacing existing PGE utility infrastructure, adding a new electrical infrastructure to interconnect a new renewable energy integration resource to PGE's Sherwood Substation at PGE's regional grid, and consolidating the existing 115KV transmission segment into a single shared structure economizing the space required to accommodate both utility infrastructure segments. The subject property is zoned Light Industrial (LI), and located at 20655 SW Langer Farms Pkwy, (Washington County Assessors Map and Tax Lot Numbers: 2S129A001650, 2S129B001800 and 2S129A001651).
Decision Maker: Hearings Officer
Status Updates
In Review