Aerial map of a neighborhood showing a detour route for Washington St, with road closure signs and a legend explaining route symbols.

Road Closure Rescheduled for Washington St. Paving: August 4-7

July 31, 2026

The road closure has been delayed due to equipment malfunction. SW Washington St between Division and Tualatin, including the intersection of Division/Washington, will be closed for paving operations starting August 4, 2026 through August 7, 2026. Roads will be reopened overnight for local access only during the week with the exception of August 6 for cement treatment work. The contractor will notify affected residents to temporarily relocate their vehicles ahead of the cement treatment work. Please plan for alternate routes.