2025 Catch Basin Replacement

2025 Catch Basin Replacement

Sherwood, OR 97140

Fall leaves block a storm drain grate.

Project Stats

Project ID: TBD
Project Type: Maintenance
Project Status: Budgeted

Project Location

Sherwood, OR 97140

Staff Contact

Sofi Lam
Civil Engineer

2025 Catch Basin Replacement

The project is part of a catch basin replacement program which replaces unsumped catch basins to the 18” sumped catch basin that complies with Clean Water Services. The 18” sump allows sediments to settle at the bottom, preventing sediments from going into the city storm system and eventually into the creeks.

We anticipate construction to begin in early October 2025 with completion in late October 2025.

Due to the location and nature of this work, please anticipate that driveway access for homes near the inlets to be replaced will be affected for short periods of time and that there will be construction noise from the work to be performed. If the inlet is located in front of your driveway, driveway access at the location of the inlet will be unavailable for a couple of weeks. The City’s inspector will be monitoring progress daily.

We appreciate your patience during the construction period.  Should you have any questions, please do not hesitate to contact Sofi Lam, P.E. at (503) 925.2303 or lams@sherwoodoregon.gov.