Meadowlark CUP-SPR

-
Barker Cabinets Phase II

-
2025 Utility Master Plan Update

-
Cedar Creek Floodplain Remapping
The City of Sherwood is working with Kittelson and Associates to study the FEMA floodplain and base flood elevations for Cedar Creek (between SW Rein Rd & Chicken Creek). The purpose of this project is to correct the initial model that was oversimplified without taking account of the hydrology of the channel. The current Flood…
-
Catch Basin Replacement Program

The annual catch basin replacement program which replaces unsumped catch basins to the 18” sumped catch basin that complies with Clean Water Services. The 18” sump allows sediments to settle at the bottom, preventing sediments from going into the city storm system and eventually into the creeks. We anticipate construction to begin in August 2026…
-
About the EPA Tannery Site Cleanup

Project History & Background The former Frontier Leather tannery site began operations in 1947 using chromium oxide to tan cow and deer hides from local slaughterhouses and split them into halves. The less valuable halves were buried on site. Sludge was discharged into two lagoons on the property. When the tannery ceased operations in the…
-
Cedar Creek Trail System

Project Overview The Cedar Creek Trail is comprised of three primary segments of the regional trail system that run off-street between Old Town, Stella Olsen Park, Highway 99W, SW Edy Road and SW Roy Rogers Road via the Cedar Creek greenway corridor. The trail segments that extend beyond these areas utilize existing on-street sidewalks and…
-
Oregon Street Improvements

SW Oregon St Improvements | Langer Farms Pkwy to Murdock Roundabout The City of Sherwood and their design consultant, Kittelson & Associates, are completing design plans to improve, modernize and widen SW Oregon Street between SW Langer Farms Parkway and the roundabout at SW Murdock Road, as well as provide storm treatment for the entire…
-
2026 Sherwood Transportation System Plan (TSP) Update

Sherwood Transportation System Plan Update Virtual Open House is Now Open! The City of Sherwood invites you to participate in the Transportation System Plan (TSP) Update Virtual Open House, now available through Monday, August 3. Whether you walk, bike, drive, take transit, or roll, your input will help shape Sherwood’s transportation system for the next 20 years.…
-
Rock Creek Trunk Capacity Upgrade Phases 1 & 2

Phase 1 of this project includes upsizing approximately 1,910 lf of 18″ diameter sanitary trunk line to 24″ diameter trunk line, commencing where Onion Flats trunk line upsizing (by CWS in 2016) was completed and running south to the first manhole beyond the P&W Railroad ROW. Phase 2 will include replacement of approximately 2,600 lf of existing 15” diameter RCP sanitary…