Downtown Streetscapes Master Plan

Downtown Streetscapes

The Downtown Sherwood Streetscape Master Plan was developed over a six month period in 2003. The design consultant team was comprised of landscape architects, civil engineers and lighting designers. The consultant team also relied on the services of a railway engineer. The design team worked through concepts and technical issues with the Sherwood Engineering Department staff. Throughout the design process, a number of goals were established that guided the development of the Streetscape Master Plan.

The three primary goals were:
• To provide a pedestrian-friendly environment;
• To create a design that is unique to Sherwood; and
• To create vibrant streets.

Please click on the link below to view the Downtown Streetscapes Master Plan.